ISV IEEE Smart Village
← Village Metering

Village Metering

ISV Tech Comm primary endeavor · 2026

Mini-grid operators need to bill each home, shut off non-payers, and catch stolen power — without city-scale AMI cost. Digest: problem→solution map, tender pitfalls, what ISV publishes.

Reading path

Overview (here) → RoadmapTC2.0 reviewVillage scope → vendor study · register checklist.

Why IEEE · why ISV

Rural metering stalls when every vendor ships a closed bundle, tenders copy utility software requirements, and operators cannot swap gear without rewriting billing. IEEE Smart Village sits outside those product lines: neutral place to compare field evidence and publish draft specs without picking a winner. Goal: mixed meter brands on one feeder, and migration paths when a vendor exits.

Problem → stack map

Same village problems, four stacks: SteamaCo, SparkMeter / EarthSpark, EnAccess OSS, and an OpenAMI could. Empty cells = not documented this pass. Source: problem-solution-map.json.

Open map full page ↗ · SteamaCo · SparkMeter · EnAccess · OpenAMI · TC2.0 proto

Why village tenders go wrong

Utility scope on a village budget

Full billing-suite and 15-minute load-profile requirements in a 200-meter tender. City tools; village wallet.

Mixing unlike things

Prepaid tokens, meter reads, inverter monitoring, and cloud format are different layers. One RFP line that says “all protocols” creates impossible bids.

Closed vendor bundles

Mesh + cloud + billing from one vendor ships fast but blocks second-source hardware and migration.

Comms fragility

When pole uplink fails, customers still need tokens and keypads must still work. May 2026 notes.

What ISV publishes (draft)

Three-phase roadmap

Roadmap — installed-base interop → microgrid core → grid connectivity.

Minimum meter reads

Register checklist — ~10 values every village billing case needs.

One cloud data format

Pole gateway → JSON over MQTT so billing is written once.

Vendor evidence

Vendor study — cited tables, contacts, dead ends.

Field validation

Anchor pilots compare real meters against the register checklist and JSON profile on live feeders — gap matrices operators can cite. SteamaCo (closed AMI, migration path) · Darway (pole EMS + JSON envelope).